Threaded combination cartridge valve is a common valve, and its installation method is as follows:
First, ensure that the type and specifications of the threaded combination cartridge valve are in line with the equipment requirements. Check the working pressure, flow and medium requirements of the valve, and select the appropriate valve.
Before installation, the equipment and pipes need to be inspected. Ensure that the surface of equipment and pipes is smooth, free of impurities, and that there is adequate support and a stable equipment base.
Place the threaded combination cartridge valve on the assembly table and verify that the flow sign on the body is consistent with the flow direction of the pipe. If necessary, auxiliary tools (such as wrenches, etc.) can be used to disassemble or assemble the valve.
Before installing the valve, it is necessary to clean the sealing surface of the valve and apply the appropriate sealant or lubricating oil. Make sure the sealing surface is clean and flat, and avoid using too much sealant.
Insert the threaded assembly cartridge valve directly into the pipe, then tighten the valve by hand until the valve is tightly attached to the pipe.
After installing the first end of the valve, you can continue to install other components, such as valve stem, handle, electric actuator, etc. If necessary, auxiliary tools can be used for assembly.
During installation, the valve needs to be tightened according to the specified torque requirements. Using tools such as torque wrenches ensures even tightening and avoids valve damage or leakage.
After all components are installed, final checks and tests are carried out. Check the valve opening and closing flexibility and sealing performance to ensure the normal operation of the valve.
Before use, it is also necessary to debug and maintain the newly installed threaded combination cartridge valve. According to the use requirements of the valve, the corresponding test and adjustment are carried out to ensure the working performance of the valve.
To sum up, the use and installation of threaded combination cartridge valves can be divided into selection and inspection, valve disassembly and connection, sealing surface treatment, installation of other components, valve tightening, inspection and testing, valve commissioning and maintenance steps. The correct installation can ensure the normal operation of the valve and improve the service life of the equipment. Be sure to pay attention to the operation specifications and precautions during installation to ensure the safe and reliable use of the threaded combination cartridge valve.
Back:
Previous::How to correctly assemble a threaded combination plug-in valve?
Next::What is the thread effect of the threaded plug-in valve reflected in?
Address: No. 139, Qingfeng West Road, Shijie Town, Dongguan City, Guangdong Province
Contact: Miss Zhang/13612729050 Mr. Pan/18825822460
    QR code:
COPYRIGHT @ Guangdong Xuou Hydraulic Technology Co, Ltd. 粤ICP备2023157353号 【Backstage】 【BMAP】 【GMAP】